Citation: | Jing-chun FENG, Ya-fang REN, Zhong-nan DUAN, Zhan-jun LIU, Hai-yang LI. 2012: Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs. Water Science and Engineering, 5(3): 350-360. doi: 10.3882/j.issn.1674-2370.2012.03.010 |
Broome, J., and Perry, J. 2002. How practitioner set share fractions in objectives cost contract. International Journal of Project Management, 20(1), 58-64. [doi: 10.1016/S0263-7863(00)00035-1]
|
Browning, T. R. 2001. Applying the design structure matrix to system decomposition and new directions. IEEE Transactions on Engineering Management, 48(3), 292-306.
|
Bubshait, A. A. 2003. Incentive/disincentive contracts and its effects on industrial projects. International Journal of Project Management, 21(1), 63-70. [doi: 10.1016/S0263-7863(01)00078-3]
|
Federation International Des Ingenieursconseils (FIDIC). 1999. Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer. International Federation of Consulting Engineers.
|
Feng, J. C., Hong, Y. Z., Zhang, J., Zhou, Z. B., Sun, W. J., and Wen, S. Y. 2010. Research on the life cycle of the program. Statistics and Decision, (9), 38-40. (in Chinese)
|
Feng, J. C., Li, L., Yang, N., Hong, Y. Z., Pang, M., Yao, X., and Wang, L. C. 2011. Research on construction of project critical chain model in South-to-North Water Diversion Project with multi-resource constraints based on portfolio technology. Water Science and Engineering, 4(2), 237-248. [doi:10.3882/ j.issn.1674-2370.2011.02.010]
|
He, Z. W., Xu, Y., and Zhu, S. Y. 2005. Study on project payment scheduling problems with bonus-penalty structure from two viewpoints. Systems Engineering—Theory and Practice, 25(10), 39-45. (in Chinese)
|
Pillai, A. S., Joshi, A., and Rao, K. S. 2002. Performance measurement of R&D projects in multi-projects concurrent engineering environment. International Journal of Project Management, 20(20), 165-177. [doi: 10.1016/S0263-7863(00)00056-9]
|
Reiss, G., Anthony, M., Chapman, J., Leigh, G., Pyne, A., and Rayner, P. 2006. Gower Handbook of Programme Management. Aldershot: Gower Publishing Limited.
|
Tareghian, H. R, and Taheri, H. 2006. An application of randomized minimum cut to the project time/cost trade-off problem. Applied Mathematics and Computation, 173(2), 1200-1207. [doi:10.1016/j.amc.2005. 04.063]
|
Turner, J., Rodney, J., and Simister, S. J. 2000. Gower Handbook of Project Management. 3rd Ed. Aldershot: Gower Publishing Limited.
|
Wang, Y. L., and Yang, Y. H. 2005. Incentive optimization and the determination of optimal project duration to multi-contracts. Forecasting, 24(2), 60-63. (in Chinese)
|
Woodbine, G. F. 2004. Moral choice and the declining influence of traditional value orientations within the financial sector of a rapidly developing region of the People’s Republic of China. Journal of Business Ethics, 55(1), 43-60. [doi: 10.1007/s10551-004-5592-5]
|
Zheng, W. Y. 2008. A Study on Incentive Mechanism of Construction Project Based on the Theory of Principal-agent. M. E. Dissertation. Tianjing: Tianjing University. (in Chinese)
|