Water Science and Engineering 2008, 1(2) 76-87  DOI:   10.3882/j.issn.1674-2370.2008.02.008   ISSN: 1674-2370 CN: 32-1785/TV

Current Issue | Archive | Search                                                            [Print]   [Close]
paper
Information and Service
This Article
Supporting info
PDF(141KB)
Reference
Service and feedback
Email this article to a colleague
Add to Bookshelf
Add to Citation Manager
Cite This Article
Email Alert
Keywords
overtopping risk analysis
earth dam
flood
wind wave
risk standard
Authors
Mo Chongxun
Liu Fanggui
Yu Me
Ma Rongyong
Sun Guikai
PubMed
Article by
Article by
Article by
Article by
Article by

Risk analysis for earth dam overtopping

Mo Chongxun*1, Liu Fanggui1, Yu Mei2, Ma Rongyong1, Sun Guikai1

1. College of Civil and Architectural Engineering, Guangxi University, Nanning 530004, P. R. China;
2. Institute of Soil Science, Chinese Academy of Sciences, Nanjing 210008, P. R. China

Abstract

In this paper, a model of overtopping risk under the joint effects of floods and wind waves, which is based on risk analysis theory and takes into account the uncertainties of floods, wind waves, reservoir capacity and discharge capacity of the spillway, is proposed and applied to the Chengbihe Reservoir in Baise City in Guangxi Zhuang Autonomous Region. The simulated results indicate that the flood control limiting level can be raised by 0.40 m under the condition that the reservoir overtopping risk is controlled within a mean variance of 5×10-6. As a result, the reservoir storage will increase to 16 million m3 and electrical energy generation and other functions of the reservoir will also increase greatly.

Keywords overtopping risk analysis   earth dam   flood   wind wave   risk standard  
Received 2008-04-15 Revised 2008-05-30 Online:  
DOI: 10.3882/j.issn.1674-2370.2008.02.008
Fund:
Corresponding Authors: Mo Chongxun*
Email:
About author:

References:
Similar articles
1.Deng Peng*1;Li Zhijia1; Liu Zhiyu2.Numerical algorithm of distributed TOPKAPI model and its application[J]. Water Science and Engineering, 2008,1(4): 14-21
2.Hassan SafiAHMED; Mohammad Mahdi HASAN; Norio TANAKA.Analysis of flow around impermeable groynes on one side of symmetrical compound channel: An experimental study[J]. Water Science and Engineering, 2010,3(1): 56-66
3.Zhou Hui*1, 2, Wu Shiqiang1, 2, Chen Huiling2, Zhou Jie1, 2, Wu Xiufeng1, 2.Similarity criterion of flood discharge atomization[J]. Water Science and Engineering, 2008,1(2): 59-65
4.Li Zhijia*1, Bao Hongjun1, Xue Cangsheng2, Hu Yuzhong2, Fang Hong2.Real-time flood forecasting of Huai River with flood diversion and retarding areas[J]. Water Science and Engineering, 2008,1(2): 10-24
5.Zhi-jia LI*1, Li-li WANG1, Hong-jun BAO1, Yu SONG2, Zhong-bo YU1, 3.Rainfall-runoff simulation and flood forecasting for Huaihe Basin[J]. Water Science and Engineering, 2008,1(3): 24-35

Copyright by Water Science and Engineering