Water Science and Engineering     2014 7 (4):  420-432    ISSN: 1674-2370  CN: 32-1785/TV

 
Comparison between dynamic programming and genetic algorithm for hydro unit economic load dispatch
Bin XU1, Ping-an ZHONG*1, 2, Yun-fa ZHAO3, Yu-zuo ZHU4, Gao-qi ZHANG5
1. College of Hydrology and Water Resources, Hohai University, Nanjing 210098, P. R. China
2. National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety, Hohai University, Nanjing 210098, P. R. China
3. China Three Gorges Corporation, Beijing100038, P. R. China
4. Datang Yantan Hydropower Corporation, Nanning 530022, P. R. China
5. Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, P. R. China
Received 2013-03-05  Revised 2014-05-10  Online 2014-10-27
Supporting info

This work was supported by the National Basic Research Program of China (973 Program, Grant No. 2013CB036406), the National Natural Science Foundation of China (Grant No. 51179044), and the Research Innovation Program for College Graduates in Jiangsu Province of China (Grant No. CXZZ12-0242).


Corresponding author: Ping-an ZHONG