Water Science and Engineering     2010 3 (2):  190-199    ISSN: 1674-2370:  CN: 32-1785/TV

Theoretical and numerical study of hydraulic characteristics of orifice energy dissipator
NingHE*1, Zhen-xing ZHAO2
1. Institute of High Energy Physics, CAS, Beijing 100049, P. R. China 
2. College of Mechanics and Materials, Hohai University, Nanjing 210098, P. R. China
Received 2010-06-25  Revised null  Online 2010-06-30
Reference  

Bushell, G. C., Yan, Y. D., Woodfield, D., Raper, J., and Amal, R. 2002. On techniques for the measurement of the mass fractal dimension of aggregates. Advances in Colloid and Interface Science, 95(1), 1-50. [doi: 10.1016/S0001-8686(00)00078-6]
Cai, J. M., Ma, J., Zhang, Z. J., and Feng, J. M. 1999. An experimental research on the flow field of orifice plate by using the 2-dimension LDV system. Journal of Hydroelectric Engineering, (4), 51-59. (in Chinese)
Chen, L., Wang, X. X., Wei, H., and Zhang, D. 2006. Prototype observation on cavitation for multi-orifice no. 1 bottom outlet Xiaolangdi Project. Water Power, 32(2), 71-74. (in Chinese)
Launder, B. E., and Spalding, D. B. 1974. The numerical computation of turbulent flows. Computer Methods in Applied Mechanics and Engineering, 3(2), 269-289. [doi: 10.1016/0045-7825(74)90029-2]
Li, Y. Z. 1999. The layout characteristics and energy dissipation of multiple flood-releasing tunnels of Xiaolangdi Project. Water Resources and Hydropower Engineering, 30(3), 10-14. (in Chinese)
Liu, Q. C., Li, G. F., and Xie, S. Z. 1993. A multiple time scale turbulence analysis of pressure tunnel flow through sharp-edged orifices. Journal of Hydroelectric Engineering, 24(2), 27-36. (in Chinese)
Qu, J. X., Xu, W. L., Yang, Y. Q., Wang, W., and Diao, M. J. 2000. Numerical simulation of flow through orifice energy-dissipators in Xiaolangdi flood-discharge tunnel. Journal of Hydrodynamics, Series B, 12(3), 41-46.
Schiestel, R. 1987. Multiple-time-scale modeling of turbulent flow in one point closures. Physics of Fluids, 30(3), 722-731. [doi:10.1063/1.866322]
Tao, W. Q. 2004. Numerical Heat Transfer (Second edition). Xi’an: Xi’an Jiaotong University Press. (in Chinese)
Tian, Z., Xu, W. L., Liu, S. J., Wang, W., Zhang, J. M., and Duan, H. 2005. Numerical calculation of combined plug energy dissipator. Advances in Science and Technology of Water Resources, 25(3), 8-10. (in Chinese)
Wei, H., Chen, L., Wu, Y. H., and Gao, J. B. 2006. Vibration prototype observation of the pipeline for water filling and pressure balance system of no. 3 flood-releasing tunnel of Xiaolangdi multi-purpose project. Water Power, 32(2), 67-70. (in Chinese)
Xia, Q. F., and Ni, H. G. 2003. Numerical simulation of plug energy dissipator. Journal of Hydraulic Engineering, 34(8), 37-42. (in Chinese)
Yang, T., Wang, X. S., and Xia, Q. F. 2004. No. 2 orifice tunnel of Xiaolangdi multipurpose dam project. Water Power, 30(9), 42-46. (in Chinese)
Zhang, J. M., Xu, W. L., Liu, S. J., and Wang, W. 2004. Numerical simulation of turbulent flow in throat type energy dissipators. Journal of Hydraulic Engineering, 35(12), 30-33. (in Chinese)

 


Corresponding author: Ning HE