Citation: | Shi-yong Wu, Wei Cao, Jiang Zheng. 2016: Analysis of working behavior of Jinping-I Arch Dam during initial impoundment. Water Science and Engineering, 9(3): 240-248. doi: 10.1016/j.wse.2016.11.001 |
Chen, X.P., Ruan, Y.S., 2014. Analysis on the vertical monitoring results of the initial impoundment for the arch dam of Jinping-I hydropower station. Sichuan Water Power 33(z1), 128-131. http://dx.doi.org/10.3969/j.issn.1001-2184.2014.z1.037 (in Chinese).
|
Deng, J.H., Dong, Y.J., 2014. Report on Safety Monitoring Analysis of Jinping-I Hydropower Project during Fourth-stage Impoundment. Jinping Construction and Administration Bureau, Chengdu (in Chinese).
|
Han, S.D., Zhao, B., Liao, Z.Y., Xia, J.H., 2010. Analysis and evaluation of monitoring data by plumb lines in early impoundment period of Xiaowan Arch Dam. Dam and Safety (3), 44-47. http://dx.doi.org/10.3969/j.issn.1671-1092.2010.03.012 (in Chinese).
|
Hu, B., Wu, Z.R., Liu, G.B., Zhao, B., Xu, B., 2012. Safety evaluation of replacement reinforcement quality in abutment contact zones of ultra-high arch dam in first impoundment period based on prototype monitoring. Water Science and Engineering 5(2), 210-218. http://dx.doi.org/10.3882/j.issn.1674-2370.2012.02.009.
|
Huang, X.C., Tang, L., Zhao, W., 2006. Deformation monitoring design for Goupitan hydropower station. Yangtze River 37(3), 48-50. http://dx.doi.org/10.3969/j.issn.1001-4179.2006.03.018 (in Chinese).
|
Jin, F., Hu, W., Pan, J.W., Yang, J., Wang, J.T., Zhang, C.H., 2011. Comparative study procedure for the safety evaluation of high arch dams. Computers and Geotechnics 38(3), 306-317. http://dx.doi.org/10.1016/j.compgeo.2010.10.008.
|
Li, P.J., Wei, P., Zhang, Q., 2009. Behavior of Laxiwa Arch Dam in the period of first impounding. Hydropower Station 35(11), 12-15. http://dx.doi.org/10.3969/j.issn.0559-9342.2009.11.005 (in Chinese).
|
Wang, Z.H., Hu, Q.Y., Yu, X.H., Duan, G.X., 2010. Analysis of operation condition of Goupitan Hydropower Station arch dam in initial impoundment period. Yangtze River 41(22), 29-31. http://dx.doi.org/10.3969/j.issn.1001-4179.2010.22.008 (in Chinese).
|
Wang, Z.Y., Yang, H., Huang, H.D., 2003. Analysis on dam deformation during initial impoundment period of Dachaoshan hydropower station. Hydropower Automation and Dam Monitoring 27(5), 57-60. http://dx.doi.org/10.3969/j.issn.1671-3893.2003.05.018 (in Chinese).
|
Wu, S.Y., Cao, W., 2014. Analysis on working behaviors of Jinping-I hydropower project during initial impoundment period. In: Proceedings of 2014 Academic Annual Conference of Chinese National Committee on Large Dams. The Yellow River Conservancy Press, Guiyang, pp. 309-318 (in Chinese).
|
Wu, Z.R., 2003. Safety Monitoring Theory and It’s Application to Hydraulic Structures. Higher Education Press, Beijing (in Chinese)
|
Yang, H., Dong, Y.J., 2015. Analysis on monitoring data of Jinping-I hydropower dam during first impoundment. Dam and Safety (3), 34-40. http://dx.doi.org/10.3969/j.issn.1671-1092.2015.03.008 (in Chinese).
|
Zhang, C., Yin, H.A., 2014. Feedback analysis of extra-high arch dam of Xiluodu in the initial impoundment phase. Hydropower Station Design 30(2), 7-12. http://dx.doi.org/10.3969/j.issn.1003-9805.2014.02.002 (in Chinese).
|
Zhang, C., Wang, R.K., Tang, X.J., 2016. Safety evaluation of Xiluodu ultra-high arch dam during the initial impoundment period. Journal of Hydraulic Engineering 47(1), 85-93. http://dx.doi.org/10.13243/j.cnki.slxb.20150404 (in Chinese).
|
Zhou, W., Hua, J.J., Chang, X.L., Yang, Q.G., Ma, G., 2011. Estimation of work status and deformation prediction of Shuibuya CFRD. Chinese Journal of Geotechnical Engineering 33(s1), 65-70 (in Chinese).
|
Zhou, Z., Rao, H.L., 2014. Special Report on Monitoring, Analysis and Assessment of Dam and Slope Safety of Jinping–I Hydropower Project in Initial Impoundment. Power China Chengdu Engineering Corporation Limited, Chengdu (in Chinese).
|