Citation: | Ji-bao WANG, He-chun CHEN. 2010: Improved design of guide wall of bank spillway at Yutang Hydropower Station. Water Science and Engineering, 3(1): 67-74. doi: 10.3882/j.issn.1674-2370.2010.01.007 |
Aliev, É. V., Gamidov, R. A., and Seidov, A. G. 1987. Introduction of new technology on the construction of the Shamkhor hydroelectric station. Power Technology and Engineering, 21(7), 26-28.
|
Guo, C. W., and Wang, S. 1998. Guide wall design of water approach channel at intake of Xiaolangdi Project. Yellow River, 120(10), 31-33. (in Chinese)
|
Hua, L. F., and Nan, X. H. 2003. Analysis of pattern layout and research of optimization for chute spillway. Journal of Water Resources and Architectural Engineering, 1(1), 21-24. (in Chinese)
|
Jian, X. P. 2005. Research on the experiments of optimizing the diversion wall of the spillway. Journal of Hebei Institute of Architectural Science and Technology, 22(3), 33-35. (in Chinese)
|
Musaev, Z. A. 1986. New designs of spillways at earth dams. Power Technology and Engineering, 20(10), 12-17.
|
National Development and Reform Commission of the People’s Republic of China (NDRC-PRC). 2002. Design Specification for River-Bank Spillway (DL/T 5166-2002). Beijing: China Electric Power Press. (in Chinese)
|
Tokmadzhyan, O. V., Martirosyan, R. G., Petrosyan, V. U., and Vartanyan, P. A. 1988. Hydraulic calculation of the trench intake of the spillway of the Kapsk reservoir. Power Technology and Engineering, 22(10), 26-28.
|
U. S. Army Corps of Engineers (USACE). 1992. Hydraulic Design of Spillway.
|
U. S. Army Corps of Engineers Waterways Experiment Station (USACE-WES). 1952. Corps of Engineers Hydraulic Design Criteria.
|