Citation: | Jing-chun FENG, Lei LI, Nan YANG, Yu-zhen HONG, Min PANG, Xiong YAO, Li-cheng WANG. 2011: Research on the Construction of Project Critical Chain Model in South-to-North Water Diversion Project with Multi-Resource Constraints Based on Portfolio Technology. Water Science and Engineering, 4(2): 225-236. doi: 10.3882/j.issn.1674-2370.2011.02.010 |
Archer, N. P., and Ghasemzadeh, F. 1999. An integrated framework for project portfolio selection. International Journal of Project Management, 17(4), 207-216. [doi: 10.1016/S0263-7863(98)00032-5]
|
Bai, S. J. 1995. Heuristic method for multiple resource-constrained in PERT/CPM network. Systems Engineering-Theory & Practice, 15(7), 42-47. (in Chinese)
|
Feng, J. C., Cao, W. M., Cheng, D. H., Li, J., and Hong, Y. Z. 2009. Research on the whole life cycle of project portfolio. Project Management Technology, (10), 18-23. (in Chinese)
|
Goldratt, E. M. 1997. Critical Chain. Great Barrington: The North Ricer Press.
|
Herroelen, W., and Leus, R. 2005. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289-306. [doi: 10.1016/j.ejor.2004.04.002]
|
Leach, L. P. 1995. Critical chain project management improves project performance. Project Management Journal, 30(2), 39-51.
|
Liu, S. X., Song, J. H., and Tang, J. F. 2006. Critical chain based approach for resource-constrained project scheduling. Acta Automatica Sinica, 32(1), 60-66. (in Chinese)
|
Long, L. D., and Ohsato, A. 2008. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, 26(6), 688-698. [doi:10.1016/ j.ijproman.2007.09.012]
|
Ma, G. F., Tu, M. Z., Shi, Z. Z., Wu, W. 2004. Design and implementation of project scheduling management system based on critical chain method. Journal of Shanghai Jiaotong University, 38(3), 377-381. (in Chinese)
|
Ma, G. F., and You, J. X. 2007. Quantitative analysis of critical chain multiple project scheduling management. Systems Engineering-Theory & Practice, 27(9), 54-60. (in Chinese)
|
Morris, P. W. G., Patel, M. B., and Wearne, S. H. 2000. Research into revising the APM project management body of knowledge. International Journal of Project Management, 18(3), 155-164. [doi:10.1016/S0263- 7863(99)00068-X]
|
Project Management Institute (PMI). 2003. PMI Research Program Overview. Newtown Square: The Project Management Institute, Inc.
|
Rivera, F. A., and Duran, A. 2004. Critical clouds and critical sets in resource-constrained projects. International Journal of Project Management, 22(6), 489-497. [doi: 10.1016/j.ijproman.2003.11.004]
|
Shou, Y. Y. 2004. Iterative technique for scheduling resource constrained multiple projects. Journal of Zhejiang University, 38(8), 1095-1099. (in Chinese)
|
Song, L. H. 2006. Research on Multi-Project Collaborative Management of Software Project. Tianjin: Tianjin University. (in Chinese)
|
Steyn, H. 2002. Project management applications of the theory of constraints beyond critical chain scheduling. International Journal of Project Management, 20(3), 75-80. [doi: 10.1016/S0263-7863(00)00054-5]
|
Tukel, O. I., Rom, W. O., and Eksioglu, S. D. 2006. An investigation of buffer sizing techniques in critical chain scheduling. European Journal of Operational Research, 172(2), 401-416. [doi:10.1016/j.ejor. 2004.10.019]
|
Wan, W., and Cai, C. 2003. Critical chain techniques in single-resource constraint project. Management Science of China, 11(2), 70-74. (in Chinese)
|
Wang, C. F., Lin, Z. F., and Ma, M. M. 2008. Preface of Modern Project Management. Beijing: China Machine Press. (in Chinese)
|
Wang, X. Q., Guo, L. Y., and Fu, T. 2005. Construction project scheduling problem research based on critical chain technique. Journal of Hebei University of Technology, 34(6), 21-23. (in Chinese)
|
Xing, C., and Ming, X. G. 2008. Optimization on critical chain planning with multi-resource constraints. Project Management Technology, (s1), 338-342. (in Chinese)
|