Citation: | Yun WANG, Sheng-lian GUO, Guang YANG, Xing-jun HONG, Ting HU. 2014: Optimal early refill rules for Danjiangkou Reservoir. Water Science and Engineering, 7(4): 403-419. doi: 10.3882/j.issn.1674-2370.2014.04.006 |
Bhaskar, N. R., and Whitlatch, E. E. 1980. Derivation of monthly reservoir release policies. Water Resources Research, 16(6), 987-993.
|
Bower, B. T., Hufschmidt, M. M., and Reedy, W. W. 1966. Operating Procedures: Their Role in the Design of Water-Resource Systems by Simulation Analyses.Cambridge: HarvardUniversity Press.
|
Celeste, A. B., and Billib, M. 2009. Evaluation of stochastic reservoir operation optimization models. Advances in Water Resources, 32(9), 1429-1443. [doi: 10.1016/j.advwatres.2009.06.008]
|
Changjiang Water Resources Commission (CWRC). 2012a. Danjiangkou Water Conservancy Reservoir Operation Guidelines. Dankou: Administration Bureau of Danjiangkou Reservoir Press.
|
Changjiang Water Resources Commission (CWRC). 2012b. The Design Flood and Operation Guideline for the Danjiangkou Reservoir. Dankou: Administration Bureau of Danjiangkou Reservoir Press.
|
Chau, K. W., Wu, C. L., and Li, Y. S. 2005. Comparison of several flood forecasting models in Yangtze River. Journal of Hydrologic Engineering, 10(6), 485-491. [doi: 10.1061/(ASCE)1084-0699(2005)10:6(485)]
|
Chen, H., Guo, S. L., Xu, C. Y., and Singh, V. P. 2007. Historical temporal trends of hydro-climatic variables and runoff response to climate variability and their relevance in water resource management in the Hanjiang basin. Journal of Hydrology, 344(3-4), 171-184. [doi: 10.1016/j.jhydrol.2007.06.034]
|
Chen, J. H., Guo, S. L., Li, Y., Liu, P., and Zhou, Y. L. 2013. Joint operation and dynamic control of flood limiting water levels for cascade reservoirs. Water Resources Management,27(3), 749-763. [doi: 10.1007/s11269-012-0213-z]
|
Clark, E. J. 1956. Impounding reservoirs. Journal of the American Water Works Association, 48(4), 349-354.
|
Guo, S. L., Chen, J. H., Li, Y., Liu, P., and Li, T. Y. 2011. Joint operation of the multi-reservoir system of the Three Gorges and the Qingjiang cascade reservoirs. Energies, 4(7), 1036-1050. [doi: 10.3390/en4071036]
|
Howson, H. R., and Sancho, N. G. F. 1975. A new algorithm for the solution of multi-state dynamic programming problems. Math Program, 8(1), 104-116.
|
Huo, J. J, Xu, J. J, and Zhang, L. L. 2011. Impoundment in advance at the end of flood season for danjiangkou reservoir. Journal of Yangtze River Scientific Research Institute, 28(12), 68-71. (in Chinese).
|
Hu, Z. P., Feng, S. Y., and Yu, F. Q. 1991. Strategy of flood control water level for Danjiangkou reservoir. Water Resources and Hydropower Engineering, 11, 1-7. (in Chinese).
|
Koutsoyiannis, D., and Economou, A. 2003. Evaluation of the parameterization-simulation-optimization approach for the control of reservoir systems. Water Resources Research, 39(6), 1-17. [doi: 10.1029/2003WR002148]
|
Labadie, J. 2004. Optimal operation of multireservoir systems: State-of-the-art review. Journal of Water Resources Planning and Management, 130(2), 93-111. [doi: 10.1061/(ASCE)0733-9496(2004)130:2(93)]
|
Li, X., Guo, S. L., Liu, P., and Chen, G. Y. 2010. Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty. Journal of Hydrology, 391(1-2), 124-132. [doi: 10.1016/j.jhydrol.2010.07.011]
|
Li, Y., Guo, S. L., Guo, H. J., Zhang, H. G., and Ding, S. X. 2013. Flood control risk and benefit of impounding water in advance for the Three Gorges Reservoir. Journal of Yangtze River Scientific Research Institute, 30(1), 8-14. (in Chinese).
|
Liu, P., Guo, S. L., Xiong, L. H., Li, W., and Zhang, H. G. 2006. Deriving reservoir refill operating rules by using the proposed DPNS model. Water Resources Management, 20(3), 337-357. [doi:10.1007/ s11269-006-0322-7]
|
Liu, X. Y., Guo, S. L., Liu, P., Chen, L., and Li, X. 2011. Deriving optimal refill rules for multi-purpose reservoir operation. Water Resources Management, 25(2), 431-448. [doi: 10.1007/s11269-010-9707-8]
|
Lund, J. R., and Guzman, J. 1999. Derived operating rules for reservoirs in series or in parallel. Journal of Water Resources Planning and Management, 125(3), 143-153. [doi:10.1061/(ASCE)0733-9496 (1999)125:3(143)]
|
Nanda, J., Bijwa, P. R., and Kothari, D. P. 1986. Application of progressive optimality algorithm to optimal hydrothermal scheduling considering dererministic and stochastic data. Electrical Power and Energy Systems, 8(1), 61-64. [doi:10.1016/0142-0615 (86)90026-8]
|
Ngo, L. L., Madsen, H., and Rosbjerg, D. 2007. Simulation and optimization modeling approach for operation of the Hoa Binh reservoir, Vietnam.Journal of Hydrology, 336(3-4), 269-281. [doi:10.1016/ j.jhydrol.2007.01.003]
|
Oliveira, R., and Loucks, D. P. 1997. Operating rules for multireservoir systems. Water Resources Research, 33(4), 839-852. [doi: 10.1029/96WR03745]
|
Palmer, R. N., Wright, J. R., Smith, J. A., Cohon, J. L., and ReVelle, C. S. 1980. Policy Analysis of Reservoir Operation in the Potomac River Basin, Volume I, Executive Summary. Baltimore: JohnsHopkinsUniversity.
|
Panuwat, P., Ashim, D. G., Mukand, S. B., and Sutat, W. 2009. Improved reservoir operation using hybrid genetic algorithm and neurofuzzy computing. Water Resources Management, 23(4), 697-720. [doi: 10.1007/s11269-008-9295-z]
|
Paredes, J., and Lund, J. R. 2006. Refill and drawdown rules for parallel reservoirs: Quantity and quality. Water Resources Management, 20(3), 359-376. [doi: 10.1007/s11269-006-0325-4]
|
Rani, D., and Moreira, M. M. 2010. Simulation-optimization modeling: A survey and potential application in reservoir systems operation. Water Resources Management, 24(6), 1107-1138. [doi:10.1007/ s11269-009-9488-0]
|
Schuster, R. J. 1987. Colorado River Simulation System, Executive Summary. Denver: U.S. Bureau of Reclamation, Engineering and ResearchCenter.
|
Simonovic, S. 1992. Reservoir system analysis: Closing gap between theory and practice. Journal of Water Resources Planning and Management, 118(3), 262-280. [doi:10.1061/(ASCE) 0733-9496(1992)118:3(262)]
|
Taormina, R., Chau, K. W., and Sethi, R. 2012. Artificial neural network simulation of hourly groundwater levels in a coastal aquifer system of the Venice lagoon. Engineering Applications of Artificial Intelligence, 25(8), 1670-1676. [doi:10.1016/ j.engappai.2012.02.009]
|
Turgeon, A. 1981. Optimal short-term hydro scheduling from the principle of progressive optimality. Water Resources Research, 17(3), 481-486. [doi: 10.1029/WR017i003p00481]
|
Wu, C. L., Chau, K. W., and Li, Y. S. 2009. Predicting monthly streamflow using data-driven models coupled with data-preprocessing techniques. Water Resources Research, 45(8), 1-23. [doi:10.1029/ 2007WR006737]
|
Wu, R. S. 1988. Derivation of Balancing Curves for Multiple Reservoir Operation. M. E. Dissertation. NewYork: CornellUniversity.
|
Wurbs, R. A. 1993. Reservoir-system simulation and optimization models. Journal of Water Resources Planning and Management, 119(4), 455-472. [doi: 10.1061/(ASCE)0733-9496(1993)119:4(455)]
|
Xiao, Y., Guo, S. L., Liu, P., Yan, B. W., and Chen, L. 2009. Design flood hydrograph based on multi-characteristic synthesis index method. Journal of Hydrologic Engineering, 14(12), 1359-1364. [doi: 10.1061/(ASCE)1084-0699(2009)14:12(1359)]
|
Xie, W., Ji, C. M., Yang, Z. J., and Zhang, X. X. 2012. Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm. Water Science and Engineering, 5 (1), 46-58. [doi: 10.3882/j.issn.1674-2370.2012.01.005]
|